20th Jan 2021
One New Change, St. Paul’s City of London,EC4
One New Change, St. Paul’s City of London,EC4- Express Glazing reglazed at night 5 number Read more
When strong winds blew a large roof aerial on top of an office block in Hoxton Square down onto its glass roof, Express Glazing Contractors were called to carry-out emergency work to keep the building weather tight and to surveying for replacement.
The replacement required the manufacture of new insulated double glazed safety glass units, approximately 2700 by 1400mm in size, together with preparation of risk assessment and method statement for replacement. The work required specialist access scaffold equipment to be erected on the roof, road closure and traffic management with local authority licence, specialist crane hire and supervision together with Express Glazing's experienced glaziers so as to complete the work all according to their plan and organisation, to the clients full satisfaction.
20th Jan 2021
One New Change, St. Paul’s City of London,EC4- Express Glazing reglazed at night 5 number Read more
16th Jan 2019
University College London replacement of damaged glass pavement panel Read more
17th Jun 2016
Express Glazing Contractors moves to newer and larger premises Read more
3rd Feb 2016
Express Glazing Contractors on the railways Read more